Skip to main content
Tagasi

EVS-EN IEC 61968-5:2020

Application integration at electric utilities - System interfaces for distribution management - Part 5: Distributed energy optimization

Üldinfo

Kehtiv alates 02.10.2020
Alusdokumendid
EN IEC 61968-5:2020; IEC 61968-5:2020
Tegevusala (ICS grupid)
33.200 Telemehaanika
Direktiivid või määrused
puuduvad

Standardi ajalugu

Staatus
Kuupäev
Tüüp
Nimetus
02.10.2020
Põhitekst
IEC 61968-5:2020 is the description of a set of functions that are needed for enterprise integration of DERMS functions. These exchanges are most likely between a DERMS and a DMS. However, since this is an enterprise integration standard which may leverage IEC 61968-100:2013 for application integration (using web services or JMS) or other loosely-coupled implementations, there are no technical limitations for systems with which a DERMS might exchange information. Also, it should be noted that a DERMS might communicate with individual DER using a variety of standards and protocols such as IEC 61850, IEEE 2030.5, Distribution Network Protocol (DNP), Sunspec Modbus, or perhaps Open Field Message Bus (OpenFMB). One role of the DERMS is to manage this disparity and complexity of communications on the behalf of the system operator. However, the communication to individual DER is out of scope of this standard. Readers should look to those standards to understand communication to individual DER’s smart inverter. The scope will be limited to the following use case categories: • DER group creation – a mechanism to manage DER in aggregate • DER group maintenance – a mechanism to add, remove, or modify the members and/or aggregated capabilities of a given group of DER • DER group deletion – removing an entire group • DER group status monitoring – a mechanism for quantifying or ascertaining the current capabilities and/or status of a group of DER • DER group forecast – a mechanism for predicting the capabilities and/or status of a group of DER for a given time period in the future • DER group dispatch – a mechanism for requesting that specified capabilities of a group of DER be dispatched to the grid • DER group voltage ramp rate control – a mechanism for requesting that a DER group following a ramp rate curve • DER group connect/disconnect – a mechanism to request that DER either isolate themselves, or reconnect to the grid as needed.

Nõutud väljad on tähistatud *

*
*
*
PDF
31,72 € koos KM-ga
Paber
31,72 € koos KM-ga
Sirvi standardit alates 2,44 € koos KM-ga
Standardi monitooring

Teised on ostnud veel

Põhitekst

EVS-EN IEC 61968-1:2020

Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations
Uusim versioon Kehtiv alates 01.07.2020
Põhitekst

EVS-EN IEC 61968-3:2021

Application integration at electric utilities - System interfaces for distribution management - Part 3: Interface for network operations
Uusim versioon Kehtiv alates 01.07.2021