Skip to main content
Tagasi

EVS-EN 50518-1:2013

Monitoring and alarm receiving centre -- Part 1: Location and construction requirements

Üldinfo

Kehtetu alates 02.09.2019
Alusdokumendid
EN 50518-1:2013
Direktiivid või määrused
puuduvad

Standardi ajalugu

Staatus
Kuupäev
Tüüp
Nimetus
02.09.2019
Põhitekst
09.12.2013
Põhitekst
07.06.2010
Põhitekst
EVS-EN 50518-1:2010
This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.
This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.

Nõutud väljad on tähistatud *

*
*
*
PDF
19,52 € koos KM-ga
Paber
19,52 € koos KM-ga
Sirvi standardit alates 2,44 € koos KM-ga
Standardi monitooring

Teised on ostnud veel

Põhitekst

EVS-EN 50518-2:2013

Monitoring and alarm receiving centre -- Part 2: Technical requirements
Kehtetu alates 02.09.2019
Põhitekst

EVS-EN 50518-3:2013

Monitoring and alarm receiving centre -- Part 3: Procedures and requirements for operation
Kehtetu alates 02.09.2019
Põhitekst

EVS-EN 1873:2014

Katuse valmistarvikud. Plastist üksikvalguselemendid. Toote spetsifikatsioon ja katsemeetodid
Kehtetu alates 02.03.2016
Põhitekst

EVS-EN 1522:2003

Aknad, uksed, luugid ja aknakatted. Kuulikindlus. Nõuded ja klassifikatsioon
Uusim versioon Kehtiv alates 21.01.2004