Skip to main content
Back

EVS-EN IEC 61439-2:2021

Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies (IEC 61439-2:2020)

General information

Valid from 01.06.2021
Base Documents
IEC 61439-2:2020; EN IEC 61439-2:2021
Directives or regulations
None

Standard history

Status
Date
Type
Name
Amendment
EN IEC 61439-2:2021/prAA:2023
01.06.2021
Main
05.06.2012
Main
This part of IEC 61439 defines the specific requirements for the power switchgear and controlgear assembly (abbreviated ‘PSC-assembly’ throughout this document see 3.1.101) as follows:
• assemblies for which the rated voltage does not exceed 1 000 V AC or 1 500 V DC;
• assemblies designed for a nominal frequency of the incoming supply or supplies not exceeding 1 000 Hz;
NOTE 1 Frequencies above 1 kHz are considered as high frequencies, see also IEC 60664-1:2007, 5.3.3.2.5 to take into account additional constraints to insulation coordination.
• assemblies intended for indoor and outdoor applications;
• stationary or movable assemblies with or without enclosures;
• assemblies intended for use in connection with the generation, transmission, distribution and conversion of electrical energy, and for the control of equipment consuming electrical energy and for associated data processing;
• assemblies designed for use under special service conditions, for example in ships and in rail vehicles, provided that the other relevant specific requirements are complied with;
NOTE 2 Supplementary requirements for assemblies in ships are covered by IEC 60092-302-2.
This document also applies to assemblies for use in photovoltaic installations, designated as photovoltaic assemblies (PVA). The particular characteristics, specific service conditions and the requirements for PVA’s are included in Annexes DD, EE and FF.
This document provides supplementary requirements for PSC-assemblies intended for use as part of the electrical equipment of machines and can be applied in addition to the
requirements given in IEC 60204-1.
This document applies to all assemblies whether they are designed, manufactured and verified on a one-off basis or fully standardised and manufactured in quantity.
The manufacture and/or assembly can be carried out by an entity other than the original manufacturer (see 3.10.1 of IEC 61439-1:2020).
This document does not apply to individual devices, for example, circuit-breakers, fuse switches and self-contained components such as, motor starters, power electronic converter systems and equipment (PECS), switch mode power supplies (SMPS), uninterruptable power supplies (UPS), basic drive modules (BDM), complete drive modules (CDM), adjustable speed power drives systems (PDS), stand-alone energy storage systems (battery and capacitor systems), and other electronic equipment which comply with their relevant product standards.
This document describes their integration into a PSC-assembly or an empty enclosure used as a part of a PSC-assembly.
For some applications, such as, explosive atmospheres, functional safety, there may be a need to comply with the requirements of other standards or legislation in addition to those specified in the IEC 61439 series.
This document does not apply to the specific types of assemblies covered by other parts of IEC 61439. For assemblies not covered by other parts, this part applies.
Unless local legislation details additional requirements, equipment within the scope of this document, which complies with this document, is deemed to meet essential safety requirements. This includes fully verified specifier options, for example user choice of protection against accidental contact with hazardous live parts of IPXXB or IP3XD. Where special requirements are agreed between the user and manufacturer, that are not fully specified within this document, for example, (i) part of the assembly is outside the scope of this document, (ii) exceptional vibration is present at the place of installation, (iii) exceptional voltage variations occur in service, or (iv) possible adverse effects from sonic or ultrasonic sources, a risk assessment and/or additional or more severe verifications may be required to demonstrate that the essential safety requirements have been fulfilled.

Required fields are indicated with *

*
*
*
PDF
31.72 € incl tax
PDF redline
41.24 € incl tax
Paper
31.72 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main + corrigendum

EVS-EN IEC 61439-1:2021

Low-voltage switchgear and controlgear assemblies - Part 1: General rules (IEC 61439-1:2020)
Newest version Valid from 01.06.2021
Main

EVS-EN 60204-1:2018

Safety of machinery - Electrical equipment of machines - Part 1: General requirements (IEC 60204-1:2016, modified)
Newest version Valid from 03.10.2018
Main + corrigendum

EVS-EN 61439-3:2012

Low-voltage switchgear and controlgear assemblies - Part 3: Distribution boards intended to be operated by ordinary persons (DBO) (IEC 61439-3:2012)
Newest version Valid from 05.12.2012
Main

EVS-EN 61439-4:2013

Low-voltage switchgear and controlgear assemblies - Part 4: Particular requirements for assemblies for construction sites (ACS) (IEC 61439-4:2012)
Newest version Valid from 09.09.2013