Skip to main content
Back

EVS-EN IEC 60079-19:2019

Explosive atmospheres - Part 19: Equipment repair, overhaul and reclamation

General information

Valid from 02.01.2020
Base Documents
IEC 60079-19:2019; EN IEC 60079-19:2019
Directives or regulations
None

Standard history

Status
Date
Type
Name
Main
prEN IEC 60079-19:2024
02.01.2020
Main
05.01.2016
Main + amendment
05.01.2016
Amendment
03.03.2011
Main
This part of IEC 60079:
– gives instructions, principally of a technical nature, on the repair, overhaul, reclamation and modification of Ex equipment designed for use in explosive atmospheres;
– applies to overhaul and repair which mitigates deficiencies identified during operation, inspection and maintenance;
– does not give advice on cable and wiring systems which can require a renewal when the equipment is re-installed; and
– is not applicable to Type of Protection “m”.

Required fields are indicated with *

*
*
*
PDF
39.04 € incl tax
Paper
39.04 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 60079-17:2014

Explosive atmospheres -- Part 17: Electrical installations inspection and maintenance
Withdrawn from 16.09.2024
Amendment

EVS-EN 60079-18:2015/A1:2017

Explosive atmospheres - Part 18: Equipment protection by encapsulation "m"
Newest version Valid from 18.12.2017
Main

EVS-EN IEC 60079-15:2019

Explosive atmospheres - Part 15: Equipment protection by type of protection "n"
Newest version Valid from 02.05.2019
Main + corrigendum

EVS-EN 60079-14:2014

Explosive atmospheres -- Part 14: Electrical installations design, selection and erection
Newest version Valid from 06.10.2014