Skip to main content
Back

EVS-EN 61850-10:2013

Communication networks and systems for power utility automation - Part 10: Conformance testing (IEC 61850-10:2012)

General information

Valid from 05.08.2013
Base Documents
IEC 61850-10:2012; EN 61850-10:2013
Directives or regulations
None

Standard history

Status
Date
Type
Name
Amendment
EN 61850-10:2013/prA1:2023
05.08.2013
Main
This part of IEC 61850 specifies standard techniques for testing of conformance of client, server and sampled value devices and engineering tools, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of the system integrator to integrate IEDs easily, operate IEDs correctly, and support the applications as intended.

Required fields are indicated with *

*
*
*
PDF
39.04 € incl tax
Paper
39.04 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 61850-5:2013

Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models (IEC 61850-5:2013)
Newest version Valid from 04.07.2013
Main

EVS-EN 61850-6:2010

Communication networks and systems for power utility automation -- Part 6: Configuration description language for communication in electrical substations related to IEDs
Newest version Valid from 08.04.2010
Main

EVS-EN 61850-7-1:2011

Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
Newest version Valid from 02.11.2011
Main

EVS-EN 61850-7-2:2010

Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
Newest version Valid from 06.12.2010