Skip to main content
Back

EVS-EN 61400-25-4:2008

Wind turbines - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile

General information

Withdrawn from 04.04.2017
Base Documents
IEC 61400-25-4:2008; EN 61400-25-4:2008
Directives or regulations
None

Standard history

Status
Date
Type
Name
04.04.2017
Main
05.12.2008
Main
The focus of the IEC 61400-25 series is on the communications between wind power plant components such as wind turbines and actors such as SCADA systems. Internal communication within wind power plant components is outside the scope of the IEC 61400-25 series. The IEC 61400-25 series is designed for a communication environment supported by a client-server model. Three areas are defined, that are modelled separately to ensure the scalability of implementations:  1)  wind power plant information model,  2)  information exchange model, and  3)  mapping of these two models to a standard communication profile.

Required fields are indicated with *

*
*
*
PDF
56.12 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 61400-25-5:2007

Wind turbines -- Part 25-5: Communications for monitoring and control of wind power plants - Conformance testing
Withdrawn from 02.01.2018
Main

EVS-EN 61400-21:2008

Wind turbines - Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines
Withdrawn from 15.06.2023
Main

EVS-EN 61400-25-1:2007

Wind turbines -- Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
Withdrawn from 18.12.2017
Main

EVS-EN 61400-25-2:2007

Wind turbines -- Part 25-2: Communications for monitoring and control of wind power plants - Information models
Withdrawn from 03.12.2015