Skip to main content
Back

EVS-EN 60076-19:2015

Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors

General information

Withdrawn from 17.07.2023
Base Documents
IEC/TS 60076-19:2013; EN 60076-19:2015
Directives or regulations
None

Standard history

Status
Date
Type
Name
17.07.2023
Main
06.10.2015
Main
To illustrate the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers.

Required fields are indicated with *

*
*
*
PDF
26.84 € incl tax
Paper
26.84 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 50588-2:2018

Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV - Part 2: Transformers with cable boxes on the high-voltage and/or low-voltage side - General requirements for transformers with rated power less than or equal to 3 150 kVA
Newest version Withdrawn from 01.11.2023
Main

EVS-EN 50588-3:2018

Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV - Part 3: Transformers with cable boxes on the high-voltage and/or low-voltage side - Cable boxes type 1 for use on transformers meeting the requirements of EN 50588-2
Newest version Withdrawn from 01.11.2023
Main

EVS-EN 50588-4:2018

Medium power transformers 50 Hz, with highest voltage for equipment not exceeding 36 kV - Part 4: Transformers with cable boxes on the high-voltage and/or low-voltage side - Cable boxes type 2 for use on transformers meeting the requirements of EN 50588-2
Newest version Withdrawn from 01.11.2023
Main

EVS-EN 13384-1:2015

Chimneys - Thermal and fluid dynamic calculation methods - Part 1: Chimneys serving one heating appliance
Withdrawn from 01.08.2019