Skip to main content
Back

EVS-EN 12699:2001

Execution of special geotechnical work - Displacement piles

General information

Withdrawn from 08.06.2015
Base Documents
EN 12699:2000
Directives or regulations
None

Standard history

Status
Date
Type
Name
08.06.2015
Main
01.06.2001
Main
This standard establishes general principles for the execution of displacement piles, that means  piles which are installed in the ground without excavation or removal of material from the ground exept for limiting heave, vibration, removal of obstructions or to assist penetration. Piles are driven into the ground using impact, vibration, screwing or a combination of these methods.

Required fields are indicated with *

*
*
*
PDF
26.84 € incl tax
Paper
26.84 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 12063:2001

Execution of special geotechnical work - Sheet-pile walls
Withdrawn from 15.11.2024
Main

EVS-EN 13230-1:2009

Railway applications - Track - Concrete sleepers and bearers - Part 1: General requirements
Withdrawn from 01.06.2016
Main

EVS-EN 13232-1:2003

Railway applications - Track - Switches and crossings - Part 1: Definitions
Withdrawn from 01.11.2023
Main

EVS-EN 13450:2007

Aggregates for railway ballast
Newest version Valid