Skip to main content
Back
NEW

EVS-EN 12063:2024

Execution of special geotechnical work - Sheet pile walls, combined pile walls, high modulus walls

General information

Valid from 15.11.2024
Base Documents
EN 12063:2024
Directives or regulations
None

Standard history

Status
Date
Type
Name
15.11.2024
Main
01.07.2001
Main

This document specifies requirements, recommendations and information concerning the execution of permanent or temporary sheet pile walls, combined pile walls, high modulus wall structures and the
handling of equipment and materials.
This document does not give requirements and recommendations for the installation of specific parts of
the structure such as ground anchorages, displacement piles and micropiles which are covered by other
documents.
This document is applicable to steel sheet pile walls, combined walls, high modulus walls, synthetic sheet
pile walls (composite), precast concrete sheet pile walls and timber sheet pile walls. Tubular piles
included in combined walls and high modulus walls can be filled with concrete.
Composite structures such as Berliner walls and sheet pile walls in combination with shotcrete, are not
covered by this document.

Required fields are indicated with *

*
*
*
PDF
39.04 € incl tax
Paper
39.04 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring